Contact us
The current position:INDEX > NEWS >> dynamic

proper usage

2016年08月04日 Source:www.lijunwood.com The author:Linyi city of shandong province lijun wood industry co., LTD

建筑覆膜板生产厂家

    First of all, in order to prevent the concrete from falling down, we did not use fiber board, wooden board and other fasteners for the template board seam too large.Instead of supporting the formwork first and then pouring the circle-beam concrete, the outer wall circle-beam is filled with bricks instead of supporting formwork, which causes the cement slurry to flow down the brick joint.When supporting the ring beam template on the brick wall, prevent the collision of the top leather brick to protect the steel bar from disturbance.After supporting the template, keep the mold clean to prevent falling into bricks, stones, wood chips and other debris.The brick of exterior wall of constructional column is extruded and deformed: when supporting the template, reinforcement measures should be taken on the exterior wall.

In addition, the formwork of the building diaphragm plate is not clamped or supported firmly, and the top of the formwork is damaged or not nailed firmly.When pouring concrete, no special person to repair the template will also become the source of safety hazards, so in the construction process to be quite careful.

More news