A brief analysis on construction requirements of building template in linyi building overlaying template factory
From the making of building templates to the construction of building templates, this set of down are strictly regulated.Many customers are not very familiar with this, so linyi building template factory to elaborate.
After the completion of the installation of the formwork, the concrete shall be poured in accordance with the design requirements, and the technical person in charge of the site and the safety inspector shall jointly check and accept it and confirm the safety and reliability.In the process of pouring concrete, special persons shall be appointed to monitor the force condition of formwork support.Dismantled building template must be after confirm the concrete strength to meet the design requirements can be, and demolition order should also be strictly in accordance with the requirements of template construction technique scheme, it is forbidden to brutal form removal.
- 2018.01.03
- 2017.12.25
- 2017.12.12
- 2017.11.20
- 2017.11.07
- 2017.10.26
- 2017.10.16
- 2017.10.06
- 2017.09.26
- 2017.09.11