Contact us
The current position:INDEX > NEWS >> dynamic

cleaning

2016年05月07日 Source:www.lijunwood.com The author:Linyi city of shandong province lijun wood industry co., LTD

In order to avoid the delay of the project, the construction template should be checked and cleaned before the early boarding. How to clean the building diaphragm?Today small make up to take you to know how to install the building diaphragm plate.

建筑覆膜板
                (Building diaphragm

The impurities left in the building formwork will cause the defects of concrete slag inclusion and so on.In order to clear the inside of the building template, a clearance should be reserved.When setting up a building template, the requirements for embedded parts and reserved holes should be to fix the embedded parts, reserved holes and reserved holes on the building template at the same time. No legacy, dimensions meet the requirements, and installation should be firm.Deviation in accordance with acceptance specifications.

Construction templates should be coated with spacer.When painting, choose oil isolator that does not affect the structure and hinder the construction of decoration project

More news