How can we ensure the quality of building diaphragm

1. Before the use of building diaphragm plates, the use of deformation and warping beyond the specification shall be stopped immediately.
2. All the hole patterns in the wall panels and beams must be properly installed and reinforced to prevent vibration running or floating of concrete during pouring.
3. At the bottom of the board and beam, the garbage cleaning hole should be considered to facilitate the closure after the garbage cleaning.
We are a professional manufacturer of building diaphragm plate. After years of inspection in the market, the quality is visible.